MANAGEMENT
PROJECT CONTROL

COST CONTROL:

Our quoting engineer will provide the most cost efficient solution to you by assuring the quality of the mould and products Enhance the supply chain management and monitor the material price closely, bring benefit to customer timely.Strengthen the internal management to minimize the overhead expenses.

 

DESIGN CONTROL:

We will have a pre-design meeting with our project dept., design dept. and manufacturing dept., to work out the best solution for mould making.15 mould designers can finish the design tasks efficiently.
Every 2D/3D design will be approved by our design manager who have profound experience in mould making and plastic material. We will send the mould design to you to get your final approval, then start the mold making.

 

ENGINEERING AND MANUFACTURING CONTROL:

Project engineer will conduct the detailed analysis of the math data and comprehend your requirement and pass to design and manufacturing department.Project engineer offers professional suggestion to design dept. after comprehensive analysis of mould and injection material, remarkably enhance the design quality.

Utilizing the top facilities to process the mould to reach high precision and high quality.
The qualified operators will remarkably reduce any wrong practices to guarantee the quality of mould.
Project engineer will give the best solution to problem arising during the production.
If the process is out of schedule, the ERP system will give warning automatically, the responsible person will take immediate action to correct it.

 

TIME CONTROL:

Working out a reasonable schedule for project and propelling concurrent engineering technique, which will remarkably improve the efficiency of manufacturing.
Quick response to the problem during manufacturing and solve it timely.
Quick response to the Engineering Change Notice.

 

QUALITY CONTROL:

Communicate with customer in depth to fully understand customer’s requirement.
Feasibility analysis (we will provide you DFM)
Assure the high quality design (2D & 3D)
Strictly control manufacturing process Strictly inspect of T1 samples
Strict Inspection in dimension and specification before shipment of mould.